A. 30 days
B. 40 days
C. 35 days
D. none of these
Answer: A
A takes (2*(3/4)*x) = 3x/2 days to do it.
(A+B)s 1 days work= 1/18
1/x + 2/3x = 1/18 or x = 30.
B. 40 days
C. 35 days
D. none of these
Answer: A
Explanation:
Suppose B takes x dáys to do the work.A takes (2*(3/4)*x) = 3x/2 days to do it.
(A+B)s 1 days work= 1/18
1/x + 2/3x = 1/18 or x = 30.